Completed Projects


Data Center/Server Room, Re-Fit, San Diego, CA
Kyocera Data Center Upgrade- Ecaro 25 gas suppression system with concealed wet sprinklers.
cache/wst.opf.3237435.xml
Quad Student Housing, New Construction, San Marcos, CA
New Construction-4 & 5 story Student Housing with Retail space on 1st floor. 5 buildings equipped with standpipes & wet fire sprinklers.
cache/wst.opf.3237990.xml
Point Loma Seafood, New Construction, San Diego
New Construction- Tear down & rebuild of restaurant located near H & M Landing.
cache/wst.opf.3279419.xml
Emerald Connect, San Diego
Tenant Improvement-
Double Interlock Preaction System for their Server Room. 160 sprinkler head tenant improvement in new office space.
cache/wst.opf.3364259.xml
Bethel Seminary, San Diego
New Construction / Addition- Extended the sprinkler system to nearly double the size of the old church. Included some remodel of the existing building as well.
.
cache/wst.opf.3742788.xml
Website Builder